Located in the Alentejo region, this 14 MWp project was successfully completed despite significant technical constraints.

The very rocky soil of this region of Portugal forced us to drill holes for each pile of the installation. This was a delicate step with photovoltaic tables of more than 100 meters, but the challenge was successfully met.

The other challenge we had to overcome was the realization of a 30kV overhead line nearly15 km long to allow the connection of this project.

This solar park is in operation since the end of 2019.

Key informations

Power

13,9 MWp

Solar modules

49 104

Year of connection

2019